6KW SINGLE PHASE SYSTEM

  • 6kw solar panels
  • 1 x SMA Sunny boy
  • 1 x SMA Sunny Island multi-mode invertor charger
  • 2 x battery frames
  • 2 x Battery CPUs
  • 1 x fuse system and frame wiring
  • 10 x batteries for 48kwh storage
  • 1 x circulation fan temperature regulated
  • 2 x Micro wind generators
  • 2 x Wind generator electronic controllers
  • 1 x Corrugated iron covered galvanised frame with fire resistant insulation with whirley bird.
  • 1 x outdoor Electrical connection box with power point inside the box.
  • 1 x light inside the control room
  • 1 x double power point inside frame/unit
  • 1 x networking unit ready for internet connection
  • Set up unit on-site

What Is NOT Included:

  • Transport to site including personal
  • Excavation of site for frame installation
  • Concrete for frame set up
  • Internet connection to unit
  • Any work related to connection to load site (i.e house, office or control room). Including excavation cable runs to load area.

18KW THREE PHASE SYSTEM (BASIC)

  • Greater than 20 kw of solar panels
  • 1 x SMA Tri power invertor
  • 3 x SMA Sunny island invertor/ charger 18kw total
  • 4 x battery frames
  • 4 x Battery CPUs
  • 2 x fuse system and frame wiring
  • 20 x batteries for 96kwh storage
  • 2 x circulation fan temperature regulated
  • 4 x Micro wind generators
  • 4 x Wind generator electronic controllers
  • 1 x Corrugated iron covered galvanised frame with fire resistant insulation with 2 whirley birds.
  • 1 x Outdoor electrical connection box with power point inside the box.
  • 1 x light inside the control room
  • 1 x double power point inside frame/unit
  • 1 x networking unit ready for internet connection
  • Set up unit on-site

What Is NOT Included:

  • Transport to site including personal
  • Excavation of site for frame installation
  • Concrete for frame set up
  • Internet connection to unit
  • Any work related to connection to load site (i.e house, office or control room). Including excavation cable runs to load area.

18KW THREE PHASE SYSTEM (INTERMEDIATE)

  • 25 kw of solar panels
  • 1 x SMA Tri power invertor
  • 3 x SMA Sunny island invertor/ charger 18kw total
  • 2 x battery frames
  • 2 x Battery CPUs
  • 1 x fuse system and frame wiring
  • 20 x batteries for 96kwh storage
  • 2 x circulation fan temperature regulated
  • 6 x Micro wind generators
  • 6 x Wind generator electronic controllers
  • 1 x Corrugated iron covered galvanised frame with fire resistant insulation with whirley bird.
  • 1 x outdoor Electrical connection box with power point inside the box.
  • 1 x light inside the control room
  • 2 x double power point inside frame/unit
  • 1 x networking unit ready for internet connection
  • Set up unit on-site

What Is NOT Included:

  • Transport to site including personal
  • Excavation of site for frame installation
  • Concrete for frame set up
  • Internet connection to unit
  • Any work related to connection to load site (i.e house, office or control room). Including excavation cable runs to load area.

18KW THREE PHASE SYSTEM (BUSINESS MODEL)

  • 25 kw of solar panels
  • 1 x SMA Tri power invertor
  • 3 x SMA Sunny island invertor/ charger 18kw total
  • 4 x battery frames
  • 4 x Battery CPUs
  • 2 x fuse system and frame wiring
  • 40 x batteries for 192kwh storage
  • 2 x circulation fan temperature regulated
  • 6 x Micro wind generators
  • 6 x Wind generator electronic controllers
  • 1 x Corrugated iron covered Frame with fire resistant insulation with whirley bird.
  • 1 x outdoor Electrical connection box with power point inside the box.
  • 1 x light inside the control room
  • 2 x double power point inside frame/unit
  • 1 x networking unit ready for internet connection
  • Set up unit on-site

What Is NOT Included:

  • Transport to site including personal
  • Excavation of site for frame installation
  • Concrete for frame set up
  • Internet connection to unit
  • Any work related to connection to load site (i.e house, office or control room). Including excavation cable runs to load area.

OPTIONAL EXTRAS

  1. Air conditioning system varying in size (a must in high ambient temperatures
  2. Water pumps in varying sizes for irrigation, firefighting, house or asset protection
  3. Water tank(s) including guttering on Standalone unit
  4. EV charging stations for domestic use

NOTE: Cost varies depending on size of system

Please Note: We are not responsible for the load area electrical systems and if we are held up for any reason beyond our controlled area the client will incur all penalty costs associated with delays, including having to leave site and return at a later date and fit in with scheduling.

WHY INSTALL AN OFF THE GRID SYSTEM DESIGN?

01

No Carbon Emissions

Utilises solar and wind renewable energy sources.

02

100% Scalable

Option to start small and expand the system as your needs grow.

03

Robust Design Built to Last

25+ years lifespan and designed to withstand extreme climatic conditions.*

04

Highest Quality Parts

From reputable, globally recognised manufacturers with up to 25-year guarantee on select parts.

05

Minimal Service Problems

For maximum reliability and minimal inconvenience.

06

Plug and Play Onsite

Factory built infrastructure which is pre-calibrated.

07

Supports 3 Phase Power Needs

Practical and robust to ensure you don’t get left in the dark.

08

Optional Extras

Talk to us about the optional air conditioning module, security camera, internet conductivity and servicing plan.